2,500m Drill Program planned at Tin Prospect - Prospect Hill
Released
Released
Announcement PDF
Heavy Rare Earths Limited ACN 648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 1 of 4 ASX:HRE
18 February 2026
ASX Announcement
2,500m Maiden Drill Program planned for Tin
prospect at South Ridge, Prospect Hill
Highlights
• Preparations well advanced for HRE’s maiden drilling program at South Ridge, Prospect
Hill Project, South Australia’s largest known and most advanced Tin Project
• Program targeting early Q2, and to comprise up to 20 Reverse Circulation (“RC”) holes
and 4 diamond holes (“DD”) for a total of 2,500m
• Prior drilling at South Ridge confirmed Sn mineralisation along 500 metres of strike and
to a depth of 120 metres, with high-grade Sn intercepts including:
o 3 metres @ 4.85% Sn from 44 metres (PHRC03)
o 5 metres @ 3.32% Sn from 84 metres (PHRC55)
o 6 metres @ 2.33% Sn from 14 metres (PHP-15)
• Re-interpretation of historical data has highlighted potential extensions to known
mineralisation along strike and at depth
• Drilling program designed to provide data for maiden Mineral Resource Estimate,
targeting late Q2.
• Submissions for all permit and consent approvals are well advanced including heritage
clearance
Heavy Rare Earths Limited (“HRE” or “the Company”) is pleased to announce that planning is well
advanced for up to 2,500m drilling program to be conducted in early Q2at the South Ridge tin
deposit, Prospect Hill, South Australia’s largest known and most advanced Tin Project.
The Prospect Hill project is located along the north-western margin of the Curnamona Craton and
comprises three contiguous exploration tenements, EL5891, EL6271 and EL6933, covering a total
area of 75 km2
. The western portion of the project area features outcropping rocks of the
Curnamona Craton (Mt Painter/Mt Babbage Inliers), which hosts significant polymetallic
mineralisation in Palaeoproterozoic-age, volcanic rocks (Figure 2).
HRE acquired a rich historical database that includes historical intersections such as 5m @3.22%
Sn, and is strongly suggestive strong potential to define high-grade tin deposits. The Company
subsequently negotiated all the mineral rights to Prospect Hill, including the Tin Project (refer to
ASX announcement 28 October 2025). A review of this data indicated the greatest immediate
potential lies in the most advanced prospect, South Ridge, where 56 drill holes and costeaning has
outlined mineralisation within a linear, steeply dipping, structural zone along 500m of strike (Figure
3).
Given the historic data, the Company anticipates the drill program may enable the definition of a
maiden resource estimate (MRE) of a high-grade tin resource at the South Ridge prospect.
Heavy Rare Earths Limited ACN 648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 2 of 4 ASX:HRE
Chair of the Board, Gabriel Chiappini commented:
“We are excited to be advanced in our planning for HRE’s maiden drill program at the South
Ridge prospect, South Australia’s largest tin project, and look forward to mobilising a drill rig
shortly for a 2,500m program.
Historic intersections already include 6m @ 3.56% Sn, and 5m @ 3.22% Sn, and we look
forward to testing the extensions and depth of the current mineralisation, with the aim of
establishing a maiden Mineral Resource Estimate at South Ridge.
Tin was the best performing base metal of 2025, recently setting an all-time high price, and
currently trading at US$48,200 / tonne. This is nearly four times the price of copper, which gives
a sense of the value creation in defining a high-grade tin resource at South ridge during Q2. We
look forward to updating investors as drilling approaches. “
24-hole program for up to 2,500m planned to expand model
The review of historical data identified that tin mineralisation is still open along strike and down dip,
with potential to significantly expand the known mineralisation model (Figure 1).
Figure 1: Longitudinal view, looking north, of the South Ridge Prospect interpreted mineralisation model, showing zones of
potential mineralisation extension, and drillhole piercement points on surface shown as coloured dots.
A program comprising a series of 24 drillholes, totalling 2500m, has been designed to expand the
known mineralisation model, with the company seeking to drill, assay and subsequently announce
a maiden Mineral Resource Estimate for South Ridge during Q2.
The majority of drillholes will be undertaken by Reverse Circulation method. The program will also
include up to 4-5 drillholes to be completed by diamond core drilling to duplicate samples of
historic percussion drillholes and provide samples for metallurgical testing.
Heavy Rare Earths Limited ACN 648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 3 of 4 ASX:HRE
Figure 2: Summary of outcropping geology in EL5891 and location of prospects, including South Ridge
Figure 3: Plan view of South Ridge prospect with selected drill and trench intersections.
Heavy Rare Earths Limited ACN 648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 4 of 4 ASX:HRE
Preparations for drilling to commence early Q2 are advanced with all Government permit and
consent approvals either submitted or nearing submission.
The Prospect Hill tenement holders have had a long and successful relationship with The Dieri
Traditional Owners, and we are currently finalising timing for HRE’s Heritage Survey Request for the
South Ridge drill sites.
The Company looks forward to updating investors as we progress toward our maiden drilling
campaign in the near term.
This announcement has beenapproved by the Board of HRE
For more information, please contact:
Gabriel Chiappini
Chair BoD
+61 417 717 480
info@hreltd.com.au
Alex Cowie
NWR Communications
+61 412 952 610
alexc@nwrcommunications.com.au
About Heavy Rare Earths Limited
Heavy Rare Earths Limited (ASX:HRE) is an Australian uranium and critical minerals exploration and development
company. HRE’s key exploration projects are in the uranium-and critical minerals-rich Curnamona Province of eastern
South Australia and in the Mid-West region of Western Australia.
Competent Person’s Statement
The Exploration Results contained in this announcement were compiled by Mr Joseph Ogierman. Mr Ogierman is a
Member (#4469) of the Australian Institute of Geoscientists (MAIG). He is a full-time employee of Heavy Rare Earths
Limited. Mr Ogierman has more than 35 years’ experience in mineral exploration and has sufficient experience relevant
to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in
the 2012 JORC Code. Mr Ogierman consents to the inclusion in this announcement of the matters based on the
Exploration Results in the form and context in which they appear.
Forward Looking Statement
This announcement includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond HRE’s control. These forward-looking statements include, but are not limited to,
all statements other than statements of historical facts contained in this presentation, including, without limitation,
those regarding HRE’s future expectations. Readers can identify forward-looking statements by terminology such as
“aim,” “anticipate,” “assume,” “believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,”
“plan,” “potential,” “predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks,
uncertainties and other factors may cause HRE’s actual results, performance, production or achievements to differ
materially from those expressed or implied by the forward-looking statements (and from past results, performance or
achievements). Readers are cautioned not to place undue reliance on forward-looking statements. Although HRE
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Share your feedback
Discover