8km Critical Mineral Corridor Confirmed at Radium Hill
Released
Released
Announcement PDF
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 1 of 19 ASX:HRE
8km Critical Mineral Corridor at
Radium Hill - High-Grade Scandium & Yttrium
Highlights
• Radium Hill reconnaissance surface rock chip sampling program yields significant
assay results
• Recent work, combining aerial geophysics and historical records, with field follow-up,
focused on better defining 8km+ structural zone extending along strike from historic
Radium Hill uranium mine
• This structural corridor is enriched in a variety of critical minerals including Yttrium,
Scandium, Rare Earth Elements1
& Vanadium
• Rock samples along this Critical Mineral Corridor (CMC) test positive for high grade
Scandium(to 959ppm Sc2O3), Yttrium(to 2236ppm Y2O3) and Uranium(to 3597ppm U3O8)
• A sample of lode rock from Railway Prospect returned 0.36% U3O8, 253 ppm Sc2O3,
1.26% TREO (incl. 0.13% Y2O3). Railway Prospect lies just over 100m along strike from
the Radium Hill deposit, indicating mineralisation continues into HRE’s project area
• The recent work strengthens HRE’s geological model of Radium Hill as a critical
minerals project, providing impetus for systematic exploration of the CMC
Heavy Rare Earths Limited (“HRE” or “the Company”) is pleased to announce very encouraging assay
results from the recent Radium Hill reconnaissance rock chip sampling program. Rock samples were
collected across the 8km-long linear SW to NE extension from the historic Radium hill mine and assessed
with a multi-element analysis.
While the assayed uranium grades were strong as expected, the consistent presence of high-grade
Scandium (up to 969ppm Sc2O3) and Yttrium (up to2236ppm Y2O3) close to the historic mine and up to 5km
from the mine, is of particular significance for HRE’s future critical minerals exploration program.
Chair of the Board, Gabriel Chiappini commented:
“It’s highly encouraging to receive positive assay results from ongoing groundwork at Radium Hill as our
geological model continues to develop. Reinterpretation of aerial geophysical data, collected by HRE in
1H_2025, coupled with intense investigation of historical data, is refining our knowledge of an 8km structural
corridor, enriched in a suite of critical minerals, including from the Radium Hill mine.
It is important to note this corridor, corresponding to the axial plane of a regional fold, outcrops for only half
of its interpreted extent and, where it does outcrop, there are numerous examples of historical mining efforts
dating back more than a century.
1
REE (Rare Earth Elements) = La, Ce, Pr, Nd, Pm, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb and Lu.
ASX Announcement
12 December 2025
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 2 of 19 ASX:HRE
Given this structural corridor is a geological extension of Australia’s first uranium mine, we anticipated
receiving positive uranium samples but are encouraged to find anomalous values for a range of critical
minerals.
In addition to anomalous uranium, we are pleased to confirm that high critical mineral values, in the form of
Scandium and Yttrium, were detected at multiple prospects along the length of the sample area, with
significant grades particularly concentrated on two main targets - Bristowe’s/Railway (<1km from Radium
Hill Mine) and Bonython Hill (5km from Radium Hill Mine).
Sampling at Bristowe’s Prospect confirmed multiple lodes of high-grade U-REE-Y-Sc mineralisation with up
to 721ppm Sc2O3,1728ppm Y2O3 and 0.36% U3O8. Perhaps of greater significance were samples from
Bonython Hill showing the strongly anomalous nature of U-REE-Y-Sc mineralisation continues for up to 5km
along strike from Radium Hill mine, with up to 284ppm Sc2O3,1309ppm Y2O3 and 0.15% U3O8.
Scandium and Yttrium are prized critical minerals and represent valuable additions to this already exciting
U-REE project.
HRE’s recently refreshed board are excited to accelerate exploration across Radium Hill alongside our other
projects, with these results adding further evidence that Radium Hill has the potential to host a sizable
critical minerals resource.
We feel there is considerable potential for discovery from a suite of critical minerals in a historical mining
camp which has not been tested by a single drillhole in the past 64 years, and where previous mining
focussed almost solely on one commodity, uranium.”
Positive findings along an 8km long extension of Radium Hill mine
The Company’s evolving geological model suggests there is considerable potential to discover mineralised
extensions to the main Radium Hill mine lodes, predominantly northeast, but also southwest of the Mine,
where 954,000 tonnes of ore @ 0.12 U3O8 were mined and processed between 1954 and 1961 to produce
850t of U3O8. Towards the end of mining, about 135 kg of scandium oxide was recovered in Port Pirie on a
pilot scale from residues2
.
Recent re-evaluation of aerial geophysical data, collected by HRE earlier this year (refer ASX announcement
19 May 2025), has further defined an 8km long structural corridor, trending northeast to southwest, through
the Radium Hill mine, corresponding to the axial plane of a regional, domed anticlinal fold. Approximately
6km of this trend lies within HRE’s Radium Hill project area. This structural corridor appears to have strong
control on the distribution of critical mineral mineralisation throughout the Radium Hill region. Importantly,
approximately 50% of the structural feature’s strike length is covered by soils and recent alluvial
sediments/scree and remains largely untested by modern exploration methods.
Analysis of the findings has been led by Bob Johnson, the highly regarded founder of Maptek, an innovative
and industry leading provider of 3D geological modelling software.
At the same time as this work, an experienced geological consultant has been searching through historical
data looking for evidence of mineralisation along the CMC. This study has been time consuming due to the
variable state of preservation of the data after so many decades.
This work has outlined areas of historical mining, dating back to the early 20th
Century, which were not part
of the main uranium mining period of the 1950s. Multiple prospects have been identified, such as railways,
2
https://catalog.sarig.sa.gov.au/dataset/rb7400044/resource/0f6dd27b-5317-4436-ae09-38154da1dfa7
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 3 of 19
ASX:HRE
Bristowe’s, Radium Hill North, Bonython Hill, and Taylor’s Shaft. The work has significantly contributed to
the critical mineral geological model being constructed by HRE.
Figure 1. Radium Hill project showing proposed Critical Mineral Corridor with selected high-grade rock samples from
recent mapping program. Complete table of assays in Appendix 1
HRE’s geological team is undertaking preliminary field testing along the CMC, with a particular focus on
historical workings and outcroppingareas, testing the relationship between uranium, scandium,yttrium and
REEs to determine whether they are part of the same or different mineralising events. Analysis of this work
is being aided by studies being concurrently undertaken at Radium Hill by renowned REE expert, Professor
Carl Spandler from the University of Adelaide.
The preliminary sampling program was designed to test mineralised lode and un-mineralised host rocks at
several areas of historical workings as well as a linear, north-east trending, radiometric anomaly outlined by
HRE’s aerial survey year (refer ASX announcement 17 July 2025) which is known as Figgan’s Dam Anomaly.
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 4 of 19
ASX:HRE
Figure 2: HRE geologist collecting representative samples of mineralisation near Taylor Shaft, Radium Hill.
33 samples were collected and submitted to Bureau Veritas Laboratories in Adelaide. Results show highly
anomalous grades for U, Sc, Y and REEs at all prospect areas sampled over a 5km length of the CMC
extending northeast from the Radium Hill mine up to, and including, Bonython North Prospect (Figure 1).
It is significant that the highest assay value for scandium (959ppm Sc2O3) is from Bonython North (Bonython
Hill Prospect), the northernmost historical working along the CMC, 5km from the Radium Hill Mine. This
sample also contains highly anomalous yttrium (843 ppm Y2O3) and uranium (1332ppm U3O8).
Other significant assays from each prospect include:
o Bristowe’s Prospect - (sample no. RH25MG024 -721ppm Sc2O3, 1727 ppm Y2O3 & 3526ppm U3O8)
o Railway Prospect - (sample no. RH25MG024 -253ppm Sc2O3, 1333 ppm Y2O3 & 3597ppm U3O8) and
o Taylor’s Shaft - (sample no. RH25MG002 -123ppm Sc2O3, 2235 ppm Y2O3 & 1545ppm U3O8)
Figure 3. Historic working at Bristowe’s Prospect showing large, 40cm, outcropping quartz vein (red line) with
davidite – ilmenite mineralisation (Sample RH25MG024 – see above)
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 5 of 19
ASX:HRE
Unseasonal rainfalls prevented access to Radium Hill North Prospect where some of the highest scandium,
U and REE assays were reported from preliminary reconnaissance sampling in mid-2025 (refer ASX
announcement 19 May 2025) – eg RHR007 – 0.37% U3O8, 936ppm Sc2O3 and 1.0% TREO.
Results from two previous reconnaissance sampling programs at Radium Hill were released before the
spectacular rise in yttrium oxide prices in mid-July 2025 and Y values were not included in these
announcements. Re-evaluation of the data makes it clear that scandium has the potential to significantly
add value to the Radium Hill critical mineral inventory. Several of the more significant results from the May
2025 sampling include:
SAMPLE EAST NORTH PROSPECT
U3O8* Sc2O3* Y2O3 V2O5 TREO**
% ppm ppm ppm %
RHR006 467333 6422633 Radium Hill Nth 0.36 644 2997 5106 1.54
RHR007 467333 6422633 Radium Hill Nth 0.37 936 2794 5641 0.72
RHR002 467070 6421962 Bristowes 0.60 882 2426 8319 1.64
RHR003 467080 6421956 Bristowes 0.41 521 1918 5391 1.22
RHR018 466971 6422088 Intermediate 0.47 445 1537 7141 0.77
* U3O8 and Sc2O3 previously reported in ASX announcement 19 May 2025 ** TREO (Total Rare Earth Oxides) = La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 +
Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Lu2O3
There are no historical workings at the Figgan’s Dam Prospect at the north-eastern extremity of the CMC,
although 5 reconnaissance samples did not return anomalous values for any critical minerals, the source of
the radiometric anomaly could not be explained, and the area warrants additional follow up work.
All assay results from 2H 2025 program are contained in Appendix 1 on page 8.
Figure 4. Taylor Shaft looking southwest along the CMC towards Radium Hill Mine.
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 6 of 19
ASX:HRE
The latest findings build on previously reported critical minerals results from HRE, (refer ASX release 15
September, “HRE advances exploration at its Critical Minerals & Uranium Projects” and ASX release 30
October2024,” Reconnaissance SamplingHighlightsPotential forRareEarths and Scandium atRadium Hill”
which demonstrated grades up to 9,068ppm U3O8, 936ppm Sc2O3, 3734ppm Y2O3 as well as 1.89% TREO.
As reported previously, the strongly anomalous Sc2O3 grades from samples along the entire length of the
CMC, as seen in Appendix 1 compare favourably to the Sc2O3 head grades of the resources for the ASX/TSX
quoted companies listed in Table 2.
Company Deposit Location Total
Tonnes
Mt
Sc203
ppm1
Market
Capitalisation
Australian Mines Limited2
Flemington NSW 6.3 684 $23m
Sunrise Energy Metals Limited3
Syerston NSW 60.3 598 $896m
Scandium International Mining
Corp4 Nyngan NSW 16.81 360 CAD$44m
West Cobar Metals Limited5
Newmont WA 12 158 $7m
1. Converted to Sc2O3 from reported Sc grades using Sc2O3 = Sc x 1.5338.
2. Australian Mines ASX announcement 14/04/25 “Australian Mines Expands Scoping Study Amid Chinese Scandium Restrictions”. Resource
also contains 601 ppm Co and 1,350 ppm Ni.
3. Sunrise Energy Metals ASX announcement 05/02/25 “Update of Syerston Scandium Project Mineral Resource”.
4. Scandium International Mining Corp 04/05/16 “Feasibility Study – Nyngan Scandium Project”
https://scandiummining.com/site/assets/files/5775/feasbility_study-nyngan_scandium_project.pdf.
5. West Cobar Metals ASX announcement 29/04/24 “Maiden Scandium Resource Declared at Salazar”. Resource also contains 915 ppm TREO
and 4.95% TiO2.
The Company has recently undergone a renewal of the board, appointing well regarded and highly
credentialed Directors who now seek to aggressively explore HRE’s project portfolio. Radium Hill’s
demonstrated prospectivity for critical minerals, such as Scandium and Yttrium, warrants further
investigation. The Company looks forward to updating the market on the exploration strategy for 2026, to
pursue this as well as explore the Company’s other prospects.
–– ENDS ––
This announcement has been approved by the Board of HRE
For more information, please contact:
Gabriel Chiappini
Chair BoD
+61 417 717 480
info@hreltd.com.au
Alex Cowie
NWR Communications
+61 412 952 610
alexc@nwrcommunications.com.au
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 7 of 19
ASX:HRE
About Heavy Rare Earths Limited
Heavy Rare Earths Limited (ASX:HRE) is an Australian uranium and critical minerals exploration and development
company. HRE’s key exploration projects are in the uranium-and critical minerals-rich Curnamona Province of eastern
South Australia and in the Mid-West region of Western Australia.
Competent Person’s Statement
The Exploration Results contained in this announcement were compiled by Mr Joseph Ogierman. Mr Ogierman is a
Member (#4469) of the Australian Institute of Geoscientists (MAIG). He is a full-time employee of Heavy Rare Earths
Limited. Mr Ogierman has more than 35 years’ experience in mineral exploration and has sufficient experience relevant
to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in
the 2012 JORC Code. Mr Ogierman consents to the inclusion in this announcement of the matters based on the
Exploration Results in the form and context in which they appear.
Forward Looking Statement
This announcement includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond HRE’s control. These forward-looking statements include, but are not limited to,
all statements other than statements of historical facts contained in this presentation, including, without limitation,
those regarding HRE’s future expectations. Readers can identify forward-looking statements by terminology such as
“aim,” “anticipate,” “assume,” “believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,”
“plan,” “potential,” “predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks,
uncertainties and other factors may cause HRE’s actual results, performance, production or achievements to differ
materially from those expressed or implied by the forward-looking statements (and from past results, performance or
achievements). Readers are cautioned not to place undue reliance on forward-looking statements. Although HRE
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements
APPENDIX 1. Assay results from rock sampling program
SITE_ID East_MGA94 North_MGA94 Prospect Lith_desc Sc2O3 U3O8 Y2O3 V2O5 TREO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb407 Dy203 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3
ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm
RH25MG001 468644 6424015 Taylor Shaft mineralised rock in shaft waste 153 469 621 2249 1821 549 663 48 129 31 9 53 14 100 24 77 14 96 14
RH25MG002 468650 6424061 Taylor Shaft mineralised rock in small trench 46 311 551 1321 1657 522 587 41 110 24 8 43 11 82 19 74 14 106 16
RH25MG003 468450 6424876 Bonython Hill mineralised rock in shaft waste 959 1333 843 4784 8545 3096 3624 248 680 133 19 151 28 185 39 125 23 171 24
RH25MG012A 465657 6421835 Western biotite-qtz-davidite; old trench waste 61 287 267 1428 2731 912 1226 89 243 42 9 44 7 44 10 35 7 54 9
RH25MG012B 465657 6421835 Western granite; old trench waste 8 4 71 71 318 60 135 14 50 13 2 13 2 11 2 7 <1 7 1
RH25MG013 465634 6421815 Western amphibolite 69 4 36 750 73 7 27 2 10 3 2 6 1 6 <1 5 <1 5 <0.5
RH25MG014 465636 6421808 Western biotite-qtz-davidite in old trench 61 596 393 1749 2073 812 859 51 104 17 4 25 6 54 15 55 11 87 15
RH25MG015 465642 6421803 Western pegmatite in old trench 0 4 9 71 100 27 45 5 15 3 1 2 <0.5 2 <1 <1 <1 <1 <0.5
RH25MG016 466306 6421417 Railway biotite-qtz-davidite fragments in old trench 253 3597 1334 7462 10654 4210 4361 254 560 106 20 134 33 258 62 221 42 342 52
RH25MG022A 467188 6422084 Bristowes biotite-qtz-ilmenite; old shaft waste 100 193 780 1500 3900 1160 1437 115 370 95 25 118 26 181 37 120 22 169 25
RH25MG022B 467188 6422084 Bristowes pink microgranite; old shaft waste 0 9 30 71 168 43 69 7 24 5 1 6 1 5 <1 3 <1 3 <0.5
RH25MG024 467077 6421958 Bristowes biotite-qtz-davidite lode exposed in small pit 721 3526 1728 5891 13749 5805 5466 290 580 95 17 146 39 324 82 300 59 476 71
RH25MG026 466897 6421944 Bristowes pegmatite 8 25 39 71 337 96 150 13 37 8 2 8 1 7 2 5 <1 6 1
RH25MG036 468564 6423694 Taylor Shaft granite; foliated 0 4 8 < 26 11 11 <1 3 <0.5 <0.5 <1 <0.5 1 <1 <1 <1 <1 <0.5
RH25MG042 468791 6423874 Taylor Shaft sandstone with haematite; Cutana Beds 15 36 6 3071 11 4 5 <1 2 <0.5 <0.5 <1 <0.5 1 <1 <1 <1 <1 <0.5
RH25MG046 468644 6424012 Taylor Shaft muscovite-biotite-qtz-davidite; old shaft waste 123 1545 2236 1607 4311 1059 1327 104 309 103 31 204 51 387 88 269 42 295 43
RH25MG047 468658 6424018 Taylor Shaft amphibolite 61 5 52 857 119 19 37 5 19 5 2 8 2 9 2 6 <1 6 <0.5
RH25MG048 468653 6424056 Taylor Shaft muscovite-biotite-qtz-davidite; old small pit 54 179 239 1678 738 194 267 23 70 18 5 25 5 40 9 31 6 40 6
RH25MG050 469658 6426027 Figgans Dam tourmaline-qtz rock 15 18 37 321 153 33 63 7 25 5 1 5 <0.5 5 <1 5 <1 5 <0.5
RH25MG051 469732 6426025 Figgans Dam kyanite-biotite-muscovite-qtz schist 23 11 48 179 420 99 188 21 68 12 2 10 2 8 2 5 <1 5 <0.5
RH25MG052 469858 6426108 Figgans Dam kyanite-biotite-muscovite-qtz schist 31 6 43 286 440 93 198 23 78 14 2 13 2 8 2 5 <1 3 <0.5
RH25MG054 470053 6426511 Figgans Dam granite gneiss 15 11 79 214 322 65 133 14 55 12 2 14 2 12 3 8 <1 7 1
RH25MG055 469912 6426366 Figgans Dam kyanite schist 23 9 70 214 456 100 201 23 78 14 2 14 2 12 2 7 <1 6 1
RH25MG063 468792 6424755 Bonython Hill biotite-qtz-davidite lode exposed in small pit 192 736 1309 1892 4846 1607 1867 130 323 64 19 97 24 188 49 172 32 236 37
RH25MG064 468788 6424765 Bonython Hill granite gneiss 92 104 524 1785 992 272 330 23 59 15 5 32 9 75 18 58 10 73 11
RH25MG066 468785 6424774 Bonython Hill biotite-qtz-davidite lode exposed in small pit 107 268 742 4284 2129 661 780 54 145 33 12 55 14 111 27 89 16 114 18
RH25MG072 468724 6424869 Bonython Hill biotite-qtz-magnetite schist; lode rocks 107 6 123 821 115 16 24 4 8 3 <0.5 8 2 17 3 11 2 13 2
RH25MG075 468452 6424888 Bonython Hill biotite-qtz schist; lode rocks 31 10 44 321 72 11 22 4 12 3 <0.5 6 1 6 <1 3 <1 3 <0.5
RH25MG077 468456 6424964 Bonython Hill biotite-qtz-ilmenite schist; lode rocks 284 109 388 1250 1148 310 421 36 114 30 5 43 9 58 13 42 7 52 8
RH25MG078 468421 6424992 Bonython Hill biotite-qtz-ilmenite schist; lode rocks 31 21 94 357 130 15 36 5 22 9 2 14 2 13 3 8 <1 6 <0.5
RH25MG080 468417 6425064 Bonython Hill biotite-qtz schist; lode rocks 176 4 102 750 125 16 28 5 16 6 1 12 2 15 3 8 1 9 1
RH25MG081 468428 6425065 Bonython Hill biotite-qtz schist; lode rocks 107 4 37 571 54 8 15 2 7 3 <0.5 5 1 5 <1 3 <1 3 <0.5
RH25MG082 468412 6425035 Bonython Hill biotite-qtz schist; lode rocks 31 16 281 321 506 70 151 19 77 28 5 46 8 46 9 23 3 17 2
ASX:HRE
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 9 of 19
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this Section apply to all succeeding Sections pages 9 to 20)
Criteria JORC Code Explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut channels, random
chips, or specific specialized industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
• A total of 43 rock chip and grab samples were collected from within
and adjacent to existing historic mining and exploration workings
within EL 5831, EL 6041 and EL 6594, along strike from the historic
Radium Hill Mine site, a 2.64 km2
area reserved from the South
Australian Mining Act 1971. This reserved area is enclosed within EL
6041 but excluded from the exploration licence.
• Samples were taken from sites such as mine dumps, prospect pits,
and adjacent mineralised and unmineralised outcrop or subcrop/float
Some samples were also taken of representative host rocks in
outcrop. Equipment used was predominately handheld hammer for
the collection of rock fragments.
• Rock chip/grab sampling is an industry-wide field technique for
establishing preliminary information on metal content and
mineralisation types present in an area of interest.
Drilling
techniques
Drill type (e.g., core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.,
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and
if so, by what method, etc.).
• No drilling was undertaken on the project.
ASX:HRE
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 10 of 19
Criteria JORC Code Explanation Commentary
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximize sample recovery and ensure
the representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No drilling was undertaken on the project.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
• No drilling was undertaken on the project.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximize representivity of samples.
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
• No drilling was undertaken on the project.
• All rock grab samples were approximately 200 - 500 g in weight.
• No subsampling is described in rock grab samples.
• No field of duplicate sampling was undertaken.
• Sample sizes were appropriate for the material sampled.
ASX:HRE
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 11 of 19
Criteria JORC Code Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g., standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e., lack of bias) and precision
have been established.
• The nature of the analyses is appropriate to the nature of
mineralisation. Analyses were complete by the Adelaide laboratory of
Bureau Veritas Minerals Pty Ltd (BV).
• The assay technique used by BV is by ICP-OES with Lithium Borate
Fusion using method LB101 for Al, Ba, Be, Cr, Fe, K, Mg, Mn, Na, P,
Sc, Si, Ti and V. Method LB102 was used with ICP-MS for Bi, Co,
Cs, Ga, Ha, In, Mo, Nb, P, Rb, Re, Sb, Se, Sn, Sr, Ta, Te, Tl, U, W,
Y, Zr, La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb and Lu.
• An aliquot of sample is accurately weighed and fused with lithium
metaborate at high temperature in a Pt crucible. The fused glass is
then digested in nitric acid.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• This report does not include drilling or drilling results.
Location of data
points
Accuracy and quality of surveys used to locate drillholes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• This report does not include drilling or drilling results.
• Grab sample locations were recorded using a hand-held Garmin
Etrex 22x GPS with ±3 metre accuracy. The grid system used is
GDA94 Zone 54.
Data spacing
and distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
• Data spacing is appropriate for the style of geological
reconnaissance and rock characterisation.
ASX:HRE
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 12 of 19
Criteria JORC Code Explanation Commentary
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralized structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
• Orientation is not considered in this reconnaissance style of rock
sampling, where samples were collected from historical ore dumps
and mine pits.
Sample security The measures taken to ensure sample security. • Samples were hand-delivered to the BV laboratory in Adelaide by the
Consultant Geologist and the Competent Person.
Audits or
reviews
The results of any audits or reviews of sampling techniques
and data.
• No audits or review of the sampling techniques and results from the
exploration program have been performed.
ASX:HRE
Heavy Rare Earths Limited ACN648 991 039
Level 21, 459 Collins Street, Melbourne VIC 3000 | +61 3 8630 3321 | info@hreltd.com.au | Page 13 of 19
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding Section 1 also apply to this Section)
Criteria JORC Code Explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• The Radium Hill Project covers 57 km2
, within which there is a 2.64
km2
area covering the historic Radium Hill Mine and Tailings Dam,
which is reserved from the South Australian Mining Act 1971.
• Heavy Rare Earths Limited (HRE) has entered into a binding
agreement with Havilah Resources Limited (Havilah) to acquire an
initial 80% interest in the uranium rights on all or part of 22
tenements in South Australia, including parts of 4 tenements at
Radium Hill (ELs 5831, 5848, 6041 and 6594). Thereafter HRE and
Havilah will co-fund exploration and de
Share your feedback
Discover