Merino Rare Earth Project Granted
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Heavy Rare Earths Limited (ASX: HRE)
1 September 2023
MERINO RARE EARTH PROJECT GRANTED
•
HRE adds new project in Western Australia’s Mid West region to rare earth
exploration portfolio: Merino
•
100 per cent-owned project targeted for ion-adsorption type rare earth deposits
•
Previous exploration delivers encouraging rare earth results
Heavy Rare Earths Limited (“HRE” or “the Company”) is pleased to report an addition to its
existing rare earth project portfolio of Cowalinya (WA) and Duke (NT).
Exploration licences E59/2795 and E59/2796, which together constitute HRE’s 100 per centowned Merino rare earth project, have now been granted by the Department of Mines,
Industry Regulation and Safety. The project is located in the Mid West region of Western
Australia approximately 225 kilometres ENE of the port city of Geraldton. It covers an area of
269 km2 and the underlying tenure comprises the Wagga Wagga and Muralgarra pastoral
leases. The sealed Geraldton-Mt Magnet Road crosses the northern part of the project area
(Figure 1).
Native Title rights over the region is held by the Yamatji Nation.
The exploration model being investigated by HRE is heavy rare earths (HREE)-enriched ionadsorption clay-hosted deposits similar to those found in southern China and Myanmar which
supply most of the world’s HREEs. The Merino area ranked very highly in an internal study
targeting this style of mineralisation in Western Australia’s palaeochannels.
Geology and Previous Exploration
The geology of the Merino area is dominated by Quaternary aeolian and alluvial sediments
and salt lakes (playas) with north-west trending inliers of Archaean porphyritic granite and
adamellite. Chemical analysis by the Geological Survey of Western Australia shows that these
granitic intrusions contain up to 516 ppm TREE (total rare earths).
Palaeochannels are inferred to occur beneath most of the project area, but owing to the
paucity of exploration drilling the precise location and depth of these palaeochannels remains
uncertain. However, drilling of a single air core hole in E59/2796 (hole YAC004) has
demonstrated the presence of a palaeochannel to a depth of at least 70 metres below surface.
Two holes drilled to the east of E59/2795 (YAC001 and 002) intersected between 40 and 93
metres of palaeochannel fill. Both holes intersected anomalous levels of the rare earths
lanthanum (La) and cerium (Ce): 10 metres @ 500 ppm La+Ce in YAC-001 and 27 metres @
350 ppm La+Ce in YAC-002.
HRE notes that rare earths were also detected in the assays of vegetation samples from
previous exploration in the north-eastern part of E59/2795 (up to 3919 ppb La+Ce+Nd+Y), but
the significance of these results is not yet understood.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
1
Figure 1: Location of Merino project tenements E59/2795 and E59/2796.
Background image: 1:250,000 scale Yalgoo and Kirkalocka Topographic Maps.
Planned Exploration by HRE
HRE plans to complete a first-pass sweep of the Merino project, comprising soil, rock and
water bore sampling, during Year 1 of exploration. Drilling in Year 2 of the program will be
subject to the results of Year 1 activities.
The Company is reviewing the Yamatji Nation Indigenous Land Use Agreement (ILUA)
particularly as it relates to the application of the ILUA’s Standard Heritage Agreement (SHA)
on HRE’s planned programs. On-ground exploration at Merino cannot commence until HRE
agrees to the terms of the Yamatji SHA.
The proposed budget for Years 1 and 2 of exploration on the Merino project by HRE is
summarized in Table 1. The statutory minimum annual expenditure commitment on the project
is the same for each year at $89,000.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
2
Table 1: Merino Project Budget.
Activity
Year 1
Year 2
$54,000
-
-
$91,500
Tenement management3
$20,000
$16,000
Administration & working capital4
$33,700
$32,500
$107,700
$150,500
Rock, soil & water bore sampling1
Drilling2
TOTAL
1
Includes field support, technical consulting & assay
2
Includes cultural heritage, field support, equipment rental & assay
3
Includes WA Government charges
4
Includes technical management
Updated Use of Funds from IPO Prospectus
The table below provides an updated 2-year Use of Funds from the Company’s IPO
Prospectus dated 5 July 2022 following the grant of the Merino tenements.
Activity
2-year Use of Funds
Drilling – exploration & resource upgrade
$2,340,000
Assaying
$440,000
Metallurgical process development
$325,000
New project – Merino
$100,000
Project Studies
$300,000
Duke project exploration (NT)
$100,000
Payment for Cowalinya vendors – exercise of option
$300,000
Costs of the Offers
$640,000
Administration & working capital
$1,455,000
Total
$6,000,000
-- Ends -This announcement has been approved by the Board of HRE.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
3
For more information, please contact:
Executive Director
Richard Brescianini
info@hreltd.com.au
Media Enquiries
Ryan Batros
info@brcapital.com.au
About Heavy Rare Earths Limited
Heavy Rare Earths Limited (ASX: HRE) is an Australian rare earth exploration and
development company. HRE’s key exploration project is Cowalinya, near Esperance in
Western Australia. This is a clay-hosted rare earth project with an Inferred Resource of
28 Mt @ 625 ppm TREO and a desirable rare earth composition where 25% are the valuable
magnet rare earths and 23% the strategic heavy rare earths.
Competent Person’s Statement
The Exploration Results contained in this announcement were compiled by Dr. Andy Wilde of
Wilde Geoscience. Dr. Wilde is a Fellow and RPGeo (Registered Professional Geoscientist)
of the Australian Institute of Geoscientists (AIG). He has more than 35 years’ experience in
mineral exploration and has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration to qualify as a Competent Person as defined in the 2012
JORC Code. Dr. Wilde consents to the inclusion in this announcement of the matters based
on the Exploration Results in the form and context in which they appear.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
4
2012 JORC Code – Table 1
Section 1: Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code Explanation
Nature and quality of sampling (e.g., cut channels, random chips, or
specific specialized industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Commentary
Rio Tinto Exploration (Rio) collected 63 x 50g twig samples at a height of
1.5 – 2m from Mulga trees taller than 3m. Rio’s open file report A103873
provides no information on sampling quality.
Zenith Minerals (Zenith) sampled aircore drillholes (see below) but
provided no information on sampling techniques other than samples were
composited to 4m.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Not known.
Not applicable.
Drilling techniques
Aspects of the determination of mineralisation that are Material to the
Public Report.
Drill type (e.g., core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g., core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and
results assessed.
Recovery data for YAC001-004 are not available and presumably were
not recorded.
Measures taken to maximize sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Not known.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Qualitative lithological logging data are available in Zenith’s open file
reports A134684-134686.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc.) photography.
See above.
The total length and percentage of the relevant intersections logged.
See above.
If core, whether cut or sawn and whether quarter, half or all core taken.
Not applicable.
Logging
HRE has not conducted any drilling at Merino to date. YAC001-004 are
historic aircore holes, drilled in 2022 by Zenith targeting potash. Details of
the drilling methods used are not available in Zenith’s open file reports.
Not known.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
5
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay
data and laboratory
tests
JORC Code Explanation
Commentary
If non-core, whether riffled, tube sampled, rotary split, etc. and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Not known.
Quality control procedures adopted for all sub-sampling stages to
maximize representivity of samples.
Not known.
Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for field
duplicate/second-half sampling.
Not known.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Not known.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
Rio sent their twig samples to Genalysis Laboratories in Perth, Western
Australia, for drying and milling (method BGMD01) and analysis using
method BG/OM10 (aqua regia digest and ICP-OES/MS finish). There is
no discussion of quality of this analysis in Rio’s report.
Not known.
Zenith’s drill samples were prepared at ALS Laboratories in Perth,
Western Australia, using four acid digest and analysed using ICP-AES.
This technique is considered to be a ‘partial’ digest and gives highly
accurate and precise analyses for a suite of multielements including the
REEs lanthanum (La), cerium (Ce) and yttrium (Y).
Verification of
sampling and
assaying
For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Not applicable
Nature of quality control procedures adopted (e.g., standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e., lack of bias) and precision have been established.
None documented.
The verification of significant intersections by either independent or
alternative company personnel.
None documented.
The use of twinned holes.
None documented.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Zenith drilling data were entered into an Excel spreadsheet.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
6
Criteria
JORC Code Explanation
Commentary
Discuss any adjustment to assay data.
No adjustments have been performed to the data presented herein.
Accuracy and quality of surveys used to locate drillholes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
Not documented.
Specification of the grid system used.
MGA94 Zone 50.
Quality and adequacy of topographic control.
Not applicable.
Data spacing for reporting of Exploration Results.
Not applicable.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Not applicable.
Whether sample compositing has been applied.
Four metre composites were collected by Zenith down the entire length of
all drill holes, except at the bottom of hole where composite intervals were
less than 4m.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
Geological structure is poorly understood due to poor outcrop.
If the relationship between the drilling orientation and the orientation of
key mineralized structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
Not known.
Sample security
The measures taken to ensure sample security.
Not known.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
No audits or reviews have been commissioned to date.
Location of data
points
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
7
Section 2: Reporting of Exploration Results
Criteria
Mineral tenement
and land tenure
status
JORC Code Explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
Commentary
Exploration licences E59/2795 and E59/2796 that make up the Merino project
are located 95 kilometres WSW of Mount Magnet in Western Australia (Figure
1). They consist of 56 and 33 graticular blocks respectively, occupying a total
area of 269 km2. They are situated on the Wagga Wagga (PL N049400) and
Muralgarra (PL N049510) pastoral leases. The registered holder of the
tenements is Heavy Rare Earths Limited (HRE).
Full native title rights have been granted over the tenements and surrounding
lands to people collectively represented by the Bundi Yamatji Aboriginal
Corporation, with whom cultural heritage surveys are undertaken in advance of
substantial disturbance exploration works.
Exploration done
by other parties
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are in good standing. There are no impediments to operating on
the tenements other than requirements of the Western Australian Department of
Mines, Industry Regulation and Safety (DMIRS), and the Yamatji Proponent
Standard Heritage Agreement which is industry standard.
Acknowledgment and appraisal of exploration by other parties.
The previous exploration of most relevance to the Merino project was
undertaken by Rio on E59/2032 in 2014, and Zenith on E59/2622-2624 in 2022.
Rio’s target commodities were Cu, Au and Mo. They collected 63 vegetation
samples (Acacia aneura), the majority of which are located of HRE’s E59/2795.
Zenith explored the region for potash deposits within inferred brine-rich
palaeochannels. They drilled 4 aircore holes, YAC001-004. One of the holes
(YAC004) is located on HRE’s E59/2796.
Geology
Deposit type, geological setting and style of mineralisation.
The deposit type being investigated is ion adsorption clay-hosted rare earth
mineralisation. This style of supergene mineralisation is developed over bedrock
granitic rock types which contain anomalous levels of rare earths. Although
relatively modest in grade, low-cost mining and processing can make this type of
deposit profitable to exploit.
The geology of the Merino area is dominated by Quaternary aeolian and alluvial
sediments and salt lakes (playas) with north-west trending inliers of Archaean
porphyritic granite and adamellite of the Murchison Terrane.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
8
Criteria
Drillhole
Information
JORC Code Explanation
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drillholes:
easting and northing of the drillhole collar
elevation or RL (Reduced Level – elevation above sea level
in metres) of the drillhole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
Commentary
Location information relating to Zenith’s drilling is as follows:
HOLE
NORTHING (m)
EASTING (m)
DIP
TOTAL DEPTH
(m)
YAC001
6863027
520057
-90°
94
YAC002
6862074
510216
-90°
47
YAC003
6857832
511635
-90°
12
YAC004
6845601
493272
-90°
71
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g., cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade
results and longer lengths of low-grade results, the procedure used for
such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
No minimum grade cut-off has been adopted.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
No metal equivalent values were necessary or used.
Relationship
between
mineralisation
widths and
intercept lengths
If the geometry of the mineralisation with respect to the drillhole angle
is known, its nature should be reported.
Down hole length, true width not known.
Diagrams
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drillhole collar locations and appropriate sectional views.
Not applicable.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Not applicable.
Data aggregation
methods
No high cut-off has been applied.
Not applicable.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g., ‘down hole length, true
width not known’).
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
9
Criteria
JORC Code Explanation
Other substantive
exploration data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (e.g., tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Further work
Commentary
Not applicable.
HRE plans to undertake soil, rock and water bore sampling at Merino.
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
10
Share your feedback